How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點擊重新得到驗證碼
主站蜘蛛池模板: 亚洲国产成人精品女人久久久| 99re久久精品国产首页| 2020年最新国产精品正在播放| 国产在线午夜卡精品影院| 性做爰高清视频在线观看视频| 精品麻豆剧传媒av国产| 日日噜噜夜夜狠狠va视频v| AV一区二区三区| 国产电影无码午夜在线播放| 美女啪啪网站又黄又免费| 国产欧洲精品自在自线官方| 精品亚洲国产成人av在线小说| 成人一区二区免费中文字幕视频| 成人午夜福利院在线观看| 天天摸天天做天天添欧美| 中文字幕日韩激情无码不卡码| 九月婷婷人人澡人人添人人爽| 精品无码日韩国产不卡av| 国产精品久久久一区二区| 国产亚洲欧美看国产| 无码成人1000部免费视频| 国产精品va在线播放| 国产性色强伦免费视频| 永久免费的无码中文字幕| 国产av导航大全精品| 浴室人妻的情欲hd三级国产| 可以直接免费观看的av网站| 国产福利一区二区三区在线观看| 国产?少萝??视频| 亚洲日韩av一区二区三区四区| 蜜臀av无码人妻精品| 久久av无码精品人妻系列| 国产成人综合色视频精品| 日本牲交大片无遮挡| 1000部精品久久久久久久久| 国产剧情国产精品一区 | 欧美午夜刺激影院| 怡春院国产精品视频| 亚洲精品人成无码中文毛片| 亚洲成色最大综合在线| 亚洲中文字幕码在线电影|